| Representative WesPac Projects
San Diego, CA Project
- Pipeline through downtown San Diego to replace 130 truck trips per day
- Major air emissions reduction for the City of San Diego
- Reduced transportation, terminal, manpower costs while adding additional dedicated storage
- Resolved / corrected longstanding quality control issues
- Marketing to suppliers resulting in addition of 3 suppliers/lower cost differentials
Memphis, TN Project
- 30 miles of pipeline, terminal, three hydrant pumping systems, three connection pipelines
- Eliminated emissions from up to 60 truck trips per day
- Large reduction in costs with major increase in security and redundancy
- Hydrant system line balance concept and real-time inventory
Reno, NV Project
- Pipeline through urban areas to airport / major supply security increase
- Eliminated need for truck deliveries of jet fuel to airport
- Reduced transportation, terminal, manpower costs, and air emissions
- Added additional dedicated jet fuel storage
- Resolved quality control issues on incoming common carrier system
- Included airport FBO in project to further reduce Consortium costs
Other Achievements
- First web-based inventory systems / first real-time reporting of pipeline deliveries
- Real time hydrant system line balance, volume and other data
|